WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`


Warning: mysqli_query(): (HY000/1030): Got error 28 from storage engine in /home/tonyseruga/public_html/wp-includes/wp-db.php on line 2030

WordPress database error: [Got error 28 from storage engine]
SELECT t.*, tt.*, tr.object_id FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON t.term_id = tt.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('category', 'post_tag', 'post_format') AND tr.object_id IN (18212) ORDER BY t.name ASC

TEP to Buy Solar Power for Historically Low Price | Tony Seruga
May
30

TEP to Buy Solar Power for Historically Low Price

By
The Arizona utility signed a 20-year agreement to purchase electricity from a 100-megawatt solar facility at a new record low price. The solar project is slated for completion by the end of 2019.
On a site located inside Tucson Electric Power’s service territory south of the metropolitan area, a new 100-megawatt solar array and an accompanying 30-megawatt energy storage system will be built, owned and operated by an affiliate of NextEra Energy Resources. TEP will buy solar energy from the facility at a historically low price from the system that is large enough to power 21,000 homes…
Share
Categories : Uncategorized

Leave a Reply

You must be logged in to post a comment.