WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`


Warning: mysqli_query(): (HY000/1030): Got error 28 from storage engine in /home/tonyseruga/public_html/wp-includes/wp-db.php on line 2030

WordPress database error: [Got error 28 from storage engine]
SELECT t.*, tt.*, tr.object_id FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON t.term_id = tt.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('category', 'post_tag', 'post_format') AND tr.object_id IN (13842) ORDER BY t.name ASC

Parsons Brinckerhoff Joins Skanska's $399M Bridge Contract | Tony Seruga
Nov
16

Parsons Brinckerhoff Joins Skanska’s $399M Bridge Contract

By
Renovations of the Pensacola bridge are expected to commence in the spring of 2017, with completion scheduled for the summer of 2020.

Rendering of the new Pensacola Bay Bridge

Rendering of the new Pensacola Bay Bridge

Pensacola, Fla.WSP | Parsons Brinckerhoff was recently selected by of the Florida Department of Transportation to design the new $399 million bridge in Pensacola as part of a design-build contract with Skanska. The project includes design and construction plans to completely rebuild the existing 3-mile-long bridge known as the Three-Mile Bridge that links Pensacola and Gulf Breeze.

The development will include shared-use paths on the outside of each bridge, reconstruction of the bridge approaches and improvements to public facilities in the Gulf Breeze Wayside Park. The upgrade aims to increase the bridge’s capacity, as well as driver, cycling and pedestrian safety…

Parsons Brinckerhoff Joins Skanska’s $399M Bridge Contract

Share
Categories : Uncategorized

Leave a Reply

You must be logged in to post a comment.