WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`


Warning: mysqli_query(): (HY000/1030): Got error 28 from storage engine in /home/tonyseruga/public_html/wp-includes/wp-db.php on line 2030

WordPress database error: [Got error 28 from storage engine]
SELECT t.*, tt.*, tr.object_id FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON t.term_id = tt.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('category', 'post_tag', 'post_format') AND tr.object_id IN (6154) ORDER BY t.name ASC

Industrial Tenants Drive Tech Facilities | Tony Seruga
Dec
14

Industrial Tenants Drive Tech Facilities

By

The manufacturing facility will serve the full-scale production needs of the future.

NORTH SAN JOSE—Construction has commenced on MidPoint@237, the only advanced manufacturing site of its magnitude in Silicon Valley. The project will have prominent entry features, interiors to suit, 28-foot clear heights, heavy-load power, ESFR sprinkler systems and is designed to achieve LEED® Silver certification.

The initial project is to consist of three, class-A advanced manufacturing buildings, totaling approximately 600,000 square feet. The buildings will be constructed simultaneously by Trammell Crow Company and joint venture partner, Principal Real Estate Investors, and are scheduled for completion in third quarter 2016. The venture has also designed four, class-A office/R&D buildings totaling approximately 400,000 square feet with construction anticipated to start early 2016…

Industrial Tenants Drive Tech Facilities

Share
Categories : Uncategorized

Leave a Reply

You must be logged in to post a comment.