WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`


Warning: mysqli_query(): (HY000/1030): Got error 28 from storage engine in /home/tonyseruga/public_html/wp-includes/wp-db.php on line 2030

WordPress database error: [Got error 28 from storage engine]
SELECT t.*, tt.*, tr.object_id FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON t.term_id = tt.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('category', 'post_tag', 'post_format') AND tr.object_id IN (17704) ORDER BY t.name ASC

Details Revealed for Obama Center | Tony Seruga
May
08

Details Revealed for Obama Center

By

The development, which has an estimated cost of roughly $1.5 billion, will be a three-building public destination featuring the Museum, the Forum and the Library.

More details emerged on plans for the Obama Presidential Center, which will sprout up on approximately 21 acres in the historic Jackson Park on the South Side of Chicago. Members of the Obama Foundation unveiled the conceptual vision and site map of the 200,000 to 225,000-square-foot project at a recent event hosted by President and Mrs. Obama.

The price tag for the development has been reported to be approximately $500 million; however, a recent Page Six article discloses that Tod Williams Billie Tsien Architects puts the figure at an estimated $1.5 billion…

Details Revealed for Obama Center

Share
Categories : Uncategorized

Leave a Reply

You must be logged in to post a comment.