WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`

WordPress database error: [Got error 28 from storage engine]
SHOW FULL COLUMNS FROM `wp_options`


Warning: mysqli_query(): (HY000/1030): Got error 28 from storage engine in /home/tonyseruga/public_html/wp-includes/wp-db.php on line 2030

WordPress database error: [Got error 28 from storage engine]
SELECT t.*, tt.*, tr.object_id FROM wp_terms AS t INNER JOIN wp_term_taxonomy AS tt ON t.term_id = tt.term_id INNER JOIN wp_term_relationships AS tr ON tr.term_taxonomy_id = tt.term_taxonomy_id WHERE tt.taxonomy IN ('category', 'post_tag', 'post_format') AND tr.object_id IN (19357) ORDER BY t.name ASC

Brazil's 90MW Cristalândia Wind Farm Begins Operations | Tony Seruga
Jul
27

Brazil’s 90MW Cristalândia Wind Farm Begins Operations

By
Enel invested approximately $190 million into the development of the 90-megawatt Cristalândia wind farm. The facility has a generating capacity of roughly 350 Gigawatt hours per year.

Enel Green Power Brasil Participações (EGPB), a subsidiary of Enel, began operation of its Cristalândia wind farm. The facility has a total installed capacity of 90 megawatts and is located in the municipalities of Brumado, Rio de Contas and Dom Basilio in Brazil’s northeastern state of Bahia.

Cristalândia’s construction cost roughly $190 million and was awarded to EGPB through the Leilão de Fontes Alternativas (LFA) public renewable energy auction in April 2015. The wind project has 20-year power purchase agreements with a pool of Brazilian electricity distribution companies…

Brazil’s 90MW Cristalândia Wind Farm Begins Operations

Share
Categories : Uncategorized

Leave a Reply

You must be logged in to post a comment.